seit 00:30 Uhr auf der ADX-Webseite:
30th August 2010
Lambouka‐1 Well ? Interim Update 2
Rig operations as at 0600 hrs Tunisian local time (GMT) on the 29th of August
were at a measured depth of 2,691 m.
In the 27th August ?Lambouka ‐1 Interim Update? it was reported ?losses of
circulation fluids, an increase in background gas shows and an anomalously high
resistivity on the Measurement While Drilling (MWD) electric logs? were
encountered in the wells primary target, the Abiod Formation.
Further drilling through the Abiod reservoir section has revealed the presence of
pinpoint dull yellow fluorescence and oil stains in the (water based) drilling mud
showing bright yellow fluorescence. Whilst this result is encouraging it cannot
without further evaluation be interpreted as proof of the presence of producable
hydrocarbons.
This result in combination with the increased background gas shows reported
earlier in the Abiod formation, provides further justification for undertaking a
comprehensive electric wire line log evaluation program which will include down
hole reservoir formation fluid sampling with an MDT tool (Modular Formation
Dynamics Tester).
ADX will continue to report drilling results from the Lambouka ‐1 well as they
occur.
Participants in the Lambouka ‐1 well are as follows (note 1);
ADX (note 2) 30% Operator
Gulfsands Petroleum Plc 30%
Carnavale Resources Ltd 20%
XState Resources Ltd (note 3) 10%
PharmAust Limited 10%
-----------
Greeny