Eloro Resources Ltd NEW

Seite 9 von 11
neuester Beitrag: 14.11.24 07:11
eröffnet am: 01.09.11 15:27 von: Koch27 Anzahl Beiträge: 272
neuester Beitrag: 14.11.24 07:11 von: PolluxEnergy Leser gesamt: 79826
davon Heute: 1
bewertet mit 3 Sternen

Seite: Zurück 1 | ... | 5 | 6 | 7 | 8 |
| 10 | 11 Weiter  

26.01.21 15:48

13215 Postings, 6707 Tage Koch27Canada

Rastet aus !!!
-----------
Bahn fahren macht Spaß!!

28.01.21 15:36

13215 Postings, 6707 Tage Koch27Die totale

Neubewertung!
Nach 12 Jahren tut sich was
-----------
Bahn fahren macht Spaß!!

12.02.21 11:40
1

396 Postings, 3133 Tage FritzBoxUnglaubliches Potenzial

Obwohl der Kurs bereits 1000 Prozent gestiegen ist, liegt er immer noch 95 Prozent unter dem ATH...  

02.03.21 22:50
1

13215 Postings, 6707 Tage Koch27News

Eloro Resources Announces C$12,900,000 Bought Deal Financing

Source: GlobeNewswire Inc.

Eloro Resources Ltd. (the ?Company? or ?Eloro?) (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) is pleased to announce that it has entered into an agreement with Haywood Securities Inc. to act as co-lead underwriter and sole bookrunner, and Cormark Securities Inc. to act as co-lead underwriter (collectively, the ?Underwriters?), pursuant to which the Underwriters have agreed to purchase, on a bought deal basis, 3,440,000 units (the ?Units?) at a price of C$3.75 per Unit (the ?Issue Price?) for gross proceeds to the Company of C$12,900,000 (the ?Offering?).
Each Unit will consist of one common share (a ?Common Share?) in the capital of the Company and one-half (1/2) of one common share purchase warrant (each whole common share purchase warrant, a ?Warrant?) of the Company. Each Warrant shall be exercisable to acquire one Common Share (a ?Warrant Share?) at a price per Warrant Share of C$5.25 for a period of 24 months from the closing date of the Offering.  
-----------
Bahn fahren macht Spaß!!

24.03.21 13:58
1

13215 Postings, 6707 Tage Koch27News!!

Eloro Resources kündigt die vollständige Ausübung der von den Underwritern gekauften Mehrzuteilungsoption zur Finanzierung des gekauften Geschäfts an

Quelle: GlobeNewswire Inc.

Eloro Resources Ltd. (das ?Unternehmen? oder ?Eloro?) (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) freut sich bekannt zu geben, dass im Zusammenhang mit seiner zuvor angekündigten gekauften Deal-Finanzierung (die ?Finanzierung?)  (siehe Pressemitteilungen von Eloro vom 2. März 2021, 3. März 2021 und 8. März 2021) und weiter bis zur Einreichung des endgültigen Kurzprospekts am 18. März 2021 bei den zuständigen Wertpapieraufsichtsbehörden in jeder der Provinzen Kanadas  Mit Ausnahme von Quebec haben Haywood Securities Inc. und Cantor Fitzgerald Canada Corporation als Co-Lead-Underwriter und Joint-Bookrunner sowie Cormark Securities Inc. als Co-Lead-Underwriter (zusammen die ?Underwriter?) beschlossen, ihre Mehrzuteilung auszuüben  Option (?Mehrzuteilungsoption?) vollständig.
Gemäß den Finanzierungsbedingungen gewährte die Mehrzuteilungsoption den Zeichnern die Option, bis zu 870.000 zusätzliche Einheiten (?Einheiten?) zu einem Preis von 3,75 CAD pro Einheit (der ?Ausgabepreis?) zu erwerben, der jederzeit ausgeübt werden kann  ganz oder teilweise bis zu dem Datum, das 30 Tage nach Abschluss der Finanzierung liegt.  Bei vollständiger Ausübung der Mehrzuteilungsoption beträgt die Gesamtzahl der im Rahmen der Finanzierung zu verkaufenden Anteile 6.670.000 Anteile zum Ausgabepreis für den gesamten Bruttoerlös an das Unternehmen in Höhe von 25.012.500 CAD.

Jede Einheit besteht aus einer Stammaktie (eine ?Stammaktie?) am Kapital der Gesellschaft und der Hälfte (1/2) eines Optionsscheins zum Kauf einer Stammaktie (jeder ganze Optionsschein zum Kauf einer Stammaktie, ein ?Optionsschein?) von  die Firma.  Jeder Warrant kann ausgeübt werden, um eine Stammaktie (eine ?Warrant-Aktie?) zu einem Preis pro Warrant-Aktie von 5,25 CAD für einen Zeitraum von 24 Monaten ab dem Abschlussdatum der Finanzierung zu erwerben.  Das Ablaufdatum der Optionsscheine kann von der Gesellschaft jederzeit nach dem sechsmonatigen Jahrestag des Abschlussdatums der Finanzierung und vor dem Ablaufdatum der Optionsscheine beschleunigt werden, wenn der volumengewichtete durchschnittliche Handelspreis der Stammaktien der Gesellschaft  ist an 20 aufeinanderfolgenden Handelstagen höher als 7,00 CAD. Zu diesem Zeitpunkt kann das Unternehmen das Ablaufdatum beschleunigen, indem es eine Pressemitteilung herausgibt, in der die verkürzte Laufzeit des Optionsscheins angekündigt wird. Daraufhin verfallen die Optionsscheine am 20. Kalendertag nach dem Datum dieser Drucklegung  Veröffentlichung.

Das Unternehmen beabsichtigt, den Nettoerlös aus der Finanzierung hauptsächlich für die weitere Exploration und Entwicklung des Iska Iska-Projekts des Unternehmens in Bolivien zu verwenden.  Am 16. Februar 2021 kündigte Eloro die Hinzufügung eines zweiten Bohrgeräts an, um mit dem Bohren des Ziels Central Breccia Pipe zu beginnen.  Die geplanten Diamantbohrungen für den Rest des Jahres 2021 und das erste Quartal 2022 umfassen 51.000 Meter, davon 6.000 Meter, die bereits budgetiert sind, und weitere 45.000 Meter, die aus der Finanzierung finanziert werden sollen.  Zusätzliche Bohrer werden schrittweise hinzugefügt, so dass bis Juli 2021 voraussichtlich 4 Oberflächenbohrgeräte mit einer erwarteten Produktion von 6.000 Metern pro Monat in Betrieb sein werden.  Diese Bohrungen werden durchgeführt, um eine Mineralressource in der Santa Barbara Breccia Pipe, der Central Breccia Pipe, der Porco (South) Breccia Pipe Target und der Huayra Kasa Breccia Pipe sowie in unterirdischen Arbeiten zu erkunden und zu definieren.  Im Rahmen der 45.000 Meter sind 6.000 Meter Bohrungen in Außenzielen auf Iska Iska und auf dem 20 Kilometer südwestlich von Iska Iska gelegenen Grundstück Pache enthalten.  Eloro beabsichtigt außerdem, aus dem Erlös der Finanzierung 2.500.000 USD in Höhe des Optionspreises von 10.000.000 USD im Rahmen einer Optionsvereinbarung zu zahlen, um eine 99% ige Beteiligung am Iska Iska-Projekt zu erwerben.

Die Finanzierung soll am oder um den 26. März 2021 abgeschlossen sein und unterliegt bestimmten Bedingungen, einschließlich, aber nicht beschränkt auf den Erhalt aller erforderlichen behördlichen und sonstigen Genehmigungen.

Die im Rahmen der Finanzierung angebotenen Wertpapiere wurden und werden nicht gemäß dem US Securities Act von 1933 in der jeweils gültigen Fassung (dem ?US Securities Act?) oder einem US-amerikanischen Wertpapiergesetz registriert und dürfen nicht im US-amerikanischen Wertpapiergesetz angeboten oder verkauft werden  USA oder an oder für Rechnung oder Nutzen von Personen in den USA, für die keine Registrierung oder eine anwendbare Ausnahme von den Registrierungsanforderungen des US Securities Act und den geltenden US-amerikanischen Wertpapiergesetzen vorliegt.  Diese Pressemitteilung stellt weder ein Angebot zum Verkauf oder die Aufforderung zur Abgabe eines Angebots zum Kauf von Wertpapieren in den Vereinigten Staaten dar, noch findet ein Verkauf dieser Wertpapiere in einer Rechtsordnung statt, in der ein solches Angebot, eine solche Aufforderung oder ein solcher Verkauf rechtswidrig wäre.

Qualifizierte Person

Dr. Bill Pearson, P.Geo., Executive Vice President Exploration von Eloro und eine qualifizierte Person als solcher Begriff, wie in National Instrument 43-101 definiert, hat den technischen Inhalt dieser Pressemitteilung geprüft und genehmigt.

Über Eloro

Eloro ist ein Explorations- und Minenentwicklungsunternehmen mit einem Portfolio an Gold- und Basismetallimmobilien in Bolivien, Peru und Quebec.  Eloro hat die Option, eine 99% ige Beteiligung an der vielversprechenden Iska Iska-Liegenschaft zu erwerben, die als polymetallischer epithermischer Porphyrkomplex klassifiziert werden kann, ein bedeutender Mineralvorkommenstyp im Departement Potosi im Süden Boliviens.  Eloro gab einen technischen Bericht NI 43-101 über Iska Iska in Auftrag, der von Micon International Limited erstellt wurde und auf der Website von Eloro und unter den bei SEDAR eingereichten Unterlagen verfügbar ist.  Iska Iska ist eine straßenzugängliche, lizenzfreie Unterkunft.  Eloro besitzt auch eine 82% ige Beteiligung an dem Gold / Silber-Projekt La Victoria, das sich im Nord-Zentral-Mineralgürtel von Peru etwa 50 km südlich von Barricks Lagunas Norte-Goldmine und der panamerikanischen Silber-La Arena-Goldmine befindet.  La Victoria besteht aus acht Bergbaukonzessionen und acht Bergbaugebieten mit einer Fläche von ungefähr 89 Quadratkilometern.  La Victoria verfügt über eine gute Infrastruktur mit Zugang zu Straße, Wasser und Strom und liegt auf einer Höhe von 3.150 m bis 4.400 m über dem Meeresspiegel.

Für weitere Informationen wenden Sie sich bitte entweder an Thomas G. Larsen, Vorsitzender und CEO, oder an Jorge Estepa, Vizepräsident, unter (416) 868-9168.

Die Informationen in dieser Pressemitteilung können zukunftsgerichtete Informationen enthalten.  Aussagen, die zukunftsgerichtete Informationen enthalten, drücken zum Zeitpunkt dieser Pressemitteilung die Pläne, Schätzungen, Prognosen, Prognosen, Erwartungen oder Überzeugungen des Unternehmens in Bezug auf zukünftige Ereignisse oder Ergebnisse aus und werden auf der Grundlage der derzeit verfügbaren Informationen als angemessen erachtet  Unternehmen (Zu den zukunftsgerichteten Aussagen in dieser Pressemitteilung gehören ohne Einschränkung Aussagen zum Abschluss der Finanzierung, zur Verwendung der Finanzierungserlöse und zu den Explorationsplänen des Unternehmens auf dem Grundstück Iska Iska).  Es kann nicht garantiert werden, dass sich zukunftsgerichtete Aussagen als richtig erweisen.  Die tatsächlichen Ergebnisse und zukünftigen Ereignisse können erheblich von den in solchen Aussagen erwarteten Ergebnissen abweichen.  Leser sollten sich nicht unangemessen auf zukunftsgerichtete Informationen verlassen.
-----------
Bahn fahren macht Spaß!!

13.04.21 13:26

13215 Postings, 6707 Tage Koch27Mega News!

Toronto, Kanada, 13. April 2021 - Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) ("Eloro" oder das "Unternehmen") gibt ein Update zu seinem Silber-Zinn-Polymetall-Projekt Iska Iska im Department Potosi im Süden Boliviens bekannt. Bis heute hat das Unternehmen 28 Diamantbohrlöcher mit einer Gesamtlänge von 10.677 Metern niedergebracht, um das Minengebiet Huayra Kasa sowie die Ziele Santa Barbara Breccia Pipe ("SBBP") und Central Breccia Pipe ("CBP") zu erproben. In dieser Pressemitteilung werden weitere Bohrergebnisse von fünf zusätzlichen Bohrlöchern (DSB-02 bis DSB-06) auf SBBP und detaillierte kontinuierliche Kanalproben im Stollen Santa Barbara gemeldet. Zwei neue Bohrungen (DCN-01 und DCN-02) wurden auf dem CBP abgeschlossen; die Ergebnisse stehen noch aus. Abbildung 1 ist eine geologische Plankarte mit den Standorten der Bohrlöcher und einer aktualisierten geologischen Interpretation. Abbildung 2 ist ein geologischer Querschnitt entlang der Achse des SBBP, der die Lage der Hauptmineralisierungszone zeigt. Abbildung 3 ist ein N-S-Querschnitt durch die SBBP. Abbildung 4 ist eine Karte der kontinuierlichen Kanalbeprobung im Stollen Santa Barbara. Tabelle 1 enthält die wichtigsten Bohrergebnisse, Tabelle 2 die vollständigen Ergebnisse der kontinuierlichen Schlitzbeprobung im Stollen Santa Barbara und Tabelle 3 die abgeschlossenen Bohrungen, deren Ergebnisse noch ausstehen. Die Highlights sind wie folgt:

Highlights

- 442 g Ag eq/t (165 g Ag/t, 3,46 % Pb und 0,46 % Sn) über 166 Meter, einschließlich 1.092 g Ag eq/t (einschließlich 446 g Ag/t, 9,03 % Pb und 1,16 % Sn) über 56,19 Meter in kontinuierlichen Kanalproben des Stollens Santa Barbara. Dieser hochgradige Abschnitt beinhaltet zwei außergewöhnliche Abschnitte mit 2.446 g Ag eq/t (1.024 g Ag/t, 25,0% Pb und 1,16% Sn) über 8,11 Meter und 1.941 g Ag eq/t (870 g Ag/t, 7,58% Pb und 2,43% Sn) über 12,3 Meter.
- 155,15 g Ag eq/t einschließlich bemerkenswert hohem Sn, 0,43 %Sn über 73,29 Meter in Bohrloch DSB-06
- 115,76 g Ag-Äq/t über 84,0 Meter und 66,44 g Ag-Äq/t über 217,9 Meter in Bohrloch DSB-03
- 96,71 g Ag eq/t über 29,4 Meter und 120,03 g Ag eq/t über 13,57 Meter in Bohrloch DSB-05
- 65,72 g Ag eq/t über 83,3 Meter, einschließlich 120,91 g Ag eq/t über 25,0 Meter in Bohrloch DSB-02
-----------
Bahn fahren macht Spaß!!

13.04.21 17:20

13215 Postings, 6707 Tage Koch27Sell on Good News

Oder was läuft grad schief?  
-----------
Bahn fahren macht Spaß!!

22.04.21 10:41

3659 Postings, 3245 Tage PolluxEnergyReport

04.05.21 13:08

13215 Postings, 6707 Tage Koch27News

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (?Eloro? oder das ?Unternehmen?) freut sich, ein Update zu seinem polymetallischen Silber-Zinn-Projekt Iska Iska im Departement Potosi im Süden Boliviens zu veröffentlichen  .  Bis heute hat das Unternehmen 29 Diamantbohrlöcher mit einer Gesamtlänge von 11.696 Metern fertiggestellt, um die Ziele der Huayra Kasa-Mine, der Santa Barbara Breccia Pipe (?SBBP?) und der Central Breccia Pipe (?CBP?) zu testen.  In dieser Pressemitteilung werden weitere Bohrergebnisse aus dem ersten Bohrloch (CDN-01) zum Testen des CBP von der nördlichen radialen Plattform berichtet.  1 ist eine geologische Plankarte, die die Positionen der Bohrlöcher und die aktualisierte geologische Interpretation zeigt.  2 ist ein geologischer NE-SW-Querschnitt durch die Ostseite des SBBP und den nordwestlichen Teil des CBP, der die Position der mineralisierten Hauptzone zeigt.  Tabelle 1 gibt signifikante Bohrergebnisse an und Tabelle 2 listet Löcher auf, die mit ausstehenden Assays abgeschlossen wurden.  Highlights sind wie folgt:
 Höhepunkte

 Das Bohrloch DCN-01 durchteufte mehrere mineralisierte Abschnitte, einschließlich 196,09 g Ag Äq / t (150,25 g Ag / t, 0,10% Sn und 0,05 g Au / t) über 56,2 m und enthielt 342,98 g Ag Äq / t (274,0 g Ag / t,  0,16% Sn und 0,16 g Au / t) über 27,53 m, von 252,84 m bis 309,04 m in Loch DCN-01.
 Das kürzlich fertiggestellte Loch DSB-10, das von einer Plattform in der SBBP aus gebohrt wurde, stieß auf über 500 m kontinuierliche Sulfidmineralisierung in einer Position, die mehrere hundert Meter unter der Mineralisierung in Loch DCN-01 liegt.  Assays stehen noch aus.
 Hauptmineralisierungszone, die im zentralen Brekzienrohr umrissen wird

 Das Bohrloch DCN-01, das aus dem nördlichen radialen Aufbau des CBP gebohrt wurde, durchteufte eine breite mineralisierte Zone mit einer Breite von 483,3 m von 107,2 m bis zum Ende des Lochs auf 590,5 m.  Innerhalb dieser mineralisierten Zone gibt es 19 Kreuzungen mit mehr als 31 g Ag Äq / t, was 61% des gesamten mineralisierten Intervalls entspricht, einschließlich acht (8) Kreuzungen mit mehr als 60 g Ag Äq / t (Tabelle 1).  Das Intervall mit der höchsten Qualität ergab 196,09 g Ag Äq / t (150,25 g Ag / t, 0,10% Sn und 0,05 g Au / t) über 56,2 m, einschließlich 342,98 g Ag Äq / t (274,0 g Ag / t, 0,16% Sn)  und 0,16 g Au / t) über 27,53 m von 252,84 m bis 309,04 m.  Wie in Abbildung 2 gezeigt und weiter unten erläutert, scheint dieser Schnittpunkt die Spitze einer sehr ausgedehnten mineralisierten Zone im CBP zu sein, die bis zu 500 m dick sein kann.
-----------
Bahn fahren macht Spaß!!

04.05.21 15:23

396 Postings, 3133 Tage FritzBoxKursziel: 15,80 CAD

Einstufung von Sphene Capital GmbH zu Eloro Resources Ltd. Unternehmen: Eloro Resources Ltd.
ISIN: CA2899003008 Anlass der Studie: Aufnahme der Coverage
Empfehlung: Buy seit: 14.04.2021
Kursziel: CAD 15,80 Kursziel auf Sicht von: 24 Monate  

04.05.21 15:29

396 Postings, 3133 Tage FritzBoxPrice target of CAD 15,80 per share

We initiate research coverage of Eloro Resources with a Buy rating and a fully diluted price target of CAD 15.80 per share,representing 314.7% upside from the current share price. Our price target is derived from the in-situ valuation of the SantaBarbara Breccia Pipe of its property Iska Iska in Bolivia, for which we calculated a NAV estimate of CAD 1,476.5 million. We applied  a  0.8x  multiple  to  our  net  asset  value  per  share estimate to arrive at our target price of CAD 15.80 per share. Other assets (above all La Victoria in Peru) were not included in our valuation. We like to highlight that the current pullback in  the  company?s  stock  price  (during  its  recent  financing rounds), could be an interesting entry point for investors, as Eloro  Resources  is  now  ideally  positioned,  in  our  view,  to aggressively  advance  its  current  portfolio  of  development projects. Should the company be able to make a discovery and eventually delineate a mineral resource at Iska Iska, we believe the share price could quickly re-rate towards our price target  

26.05.21 13:09

13215 Postings, 6707 Tage Koch27News

Eloro Resources schneidet 122,7 g Ag Äq / t über 123,6 m und 105,4 g Ag Äq / t über 173,6 m in der Santa Barbara Breccia Pipe bei ...

Quelle: GlobeNewswire Inc.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (?Eloro? oder das ?Unternehmen?) freut sich, ein Update zu seinem polymetallischen Silber-Zinn-Projekt Iska Iska im Departement Potosi im Süden Boliviens zu veröffentlichen  .  Bis heute hat das Unternehmen 33 Diamantbohrlöcher mit einer Gesamtlänge von 14.346,7 Metern (?m?) fertiggestellt, um die Ziele der Huayra Kasa-Mine, der Santa Barbara Breccia Pipe (?SBBP?) und der Central Breccia Pipe (?CBP?) zu testen.  Diese Pressemitteilung berichtet über Bohrergebnisse aus Loch DSB-07, in dem der SBBP getestet wurde.  Derzeit sind bei Iska Iska drei Bohrinseln in Betrieb.  Zwei Oberflächenbohrgeräte testen die zentrale Brekzie aus den nördlichen und südlichen radialen Aufbauten, und eine unterirdische Bohrmaschine testet das Zielgebiet östlich von SBBP.  1 ist eine geologische Plankarte, die die Positionen der Bohrlöcher mit aktualisierter geologischer Interpretation zeigt.  2 ist ein NW-SE-Längsschnitt entlang der Achse des 800 m langen SBBP, der die Position der mineralisierten Hauptzone und des Lochs DSB-07 zeigt.  In Tabelle 1 sind die signifikanten Bohrergebnisse aufgeführt, und in Tabelle 2 sind die mit ausstehenden Assays und laufenden Löchern abgeschlossenen Löcher aufgeführt.  Highlights sind wie folgt:
Höhepunkte

Das Bohrloch DSB-07, das bei -60 Grad bis zu einer Tiefe von 683,4 m südöstlich von der Radialbohrplattform auf SBBP gebohrt wurde, kreuzte mehrere mineralisierte Abschnitte, darunter:

122,66 g Silberäquivalent / Tonne ("g Ag Äq / t") (35,05 g Ag / t, 0,72% Zn, 0,61% Pb, 0,11% Sn und 0,06 g Au / t) über 123,61 m von 236,60 m bis 360,21 m einschließlich  205,74 g Ag Äq / t (92,30 g Ag / t, 0,57% Zn, 0,85% Pb, 0,18% Sn und 0,07 g Au / t) über 32,32 m von 317,21 m bis 349,53 m.
105,41 g Ag Äq / t (8,55 g Ag / t, 1,01% Zn, 0,48% Pb, 0,06% Sn und 0,38 g Au / t) über 173,58 m von 449,87 m bis 623,45 m, einschließlich 199,77 g Ag Äq / t (21,90 g)  Ag / t, 1,18% Zn, 0,93% Pb, 0,12% Sn und 0,94 g Au / t) über 39,08 m von 551,19 m bis 590,27 m.
146,19 g Ag Äq / t (1,70 g Ag / t, 0,00% Zn, 0,01% Pb, 0,42% Sn und 0,02 g Au / t) über 10,20 m von 171,60 m bis 181,80 m in der Oxidzone, was auf das Potenzial für eine signifikante Sn-Mineralisierung hinweist  in dieser stark ausgelaugten näheren Oberflächenzone.

Insgesamt ergaben 64% dieses 683,4 m langen Lochs meldepflichtige mineralisierte Intervalle.
Tom Larsen, Vorsitzender und CEO von Eloro, sagte: ?Die Ergebnisse von DSB-07 sind äußerst ermutigend und zeigen weiterhin den diversifizierten Metallwert und das Größenpotenzial des Iska Iska-Silber-Zinn-Polymetallsystems.  Das Leduc-Bohrprogramm vor Ort, das derzeit aus 3 Bohrern (zwei Oberflächen- und ein Untergrundbohrer) besteht, schreitet mit einer Geschwindigkeit von 250 bis 300 m pro Tag sehr effizient voran, was zu einem sehr positiven Entdeckungstempo führt.  Derzeit warten im ALS Global Laboratory in Lima ca. 1.500 Proben auf die Analyse.  Insbesondere warten wir gespannt auf die Ergebnisse des Lochs DSB-10, das, wie bereits berichtet (siehe Pressemitteilung vom 4. Mai 2021), mehr als 500 m kontinuierliche Sulfidmineralisierung durchschnitten hat.  Obwohl es aufgrund der COVID-19-Protokolle, die die kritische Versorgung des Labors, insbesondere von Sauerstoff, einschränkten, zu Verzögerungen bei der Durchführung des Assays gekommen ist, sind wir optimistisch, dass sich die Bedingungen in naher Zukunft verbessern und der Turnaround wieder auf ein normaleres Niveau zurückkehren wird. ?

DR.
-----------
Bahn fahren macht Spaß!!

15.06.21 16:56

3659 Postings, 3245 Tage PolluxEnergyReport

Eloro Resources ist Teil eines neuen, deutschsprachigen Silber-Reports: https://www.resource-capital.ch/de/reports/  

06.07.21 13:16

13215 Postings, 6707 Tage Koch27News!

Multiple Holes Yield Silver-Tin Polymetallic Intercepts in the Santa Barbara and Central Breccia Pipes at Eloro Resources? ...

Source: GlobeNewswire Inc.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (?Eloro?, or the ?Company?) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 43 diamond drill holes totalling 20,030 metres (m) to test major target areas at Iska Iska. This press release reports drilling results from four (4) additional holes which tested the Santa Barbara Breccia Pipe (?SBBP?) and Central Breccia Pipe (?CBP?). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. One surface drill rig is completing first pass drilling of the CBP from the northern radial platform and a second surface drill is testing the major Porco (South) Target. The third drill, an underground rig, is testing the northeast part of SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. Figure 2 is a more detailed geological plan map of the SBBP and CBP areas. Figure 3 is a NW-SE geological section along the northwestern part of the CBP and the eastern part of SBBP showing locations of the main mineralized zone and of drill holes DSB-08, DSB-10 and DCN-2 in this release. Figure 4 shows the currently interpreted metal zoning pattern on this same section. Table 1 provides significant drilling results and Table 2 lists holes completed with assays pending as well as holes in progress in the three major target areas. Highlights are as follows:
Highlights:

Hole DSB-08, testing the northeast quadrant of the SBBP, encountered eighteen reportable mineralized intercepts beginning near surface to its terminus at 614.4 m. The longest intercept was 69.89 g Ag eq/t over 252.89m from 355.12 to 608.02m including several higher-grade sections of 196.60 g Ag eq/t including 131.13 g Ag/t over 14.52m, 134.62 g Ag eq/t including 93.25 g Ag/t over 21.08m and 145.35 g Ag eq/t including 2.38% Zn over 10.11m.
Hole DSB-10, testing the southwest quadrant of the SBBP and northern part of the CBP, encountered twenty-nine reportable mineralized intercepts beginning near surface to its terminus at 1,019.4m. Tin was notably elevated in many intervals suggesting proximity to a mineralizing intrusive source in this area. Notable intercepts include 114.96 Ag eq/t including 0.325% tin (Sn) over 56.2m from 322.18m to 378.30m including a higher-grade section of 187.98 g Ag eq/t including 0.535% Sn over 28.86m, 80.71 g Ag eq/t including 0.213% Sn over 74.39m from 474.86 to 549.25m and 118.69 g Ag eq/t over 10.77m from 829.97 to 840.74m
-----------
Bahn fahren macht Spaß!!

12.07.21 14:28

13215 Postings, 6707 Tage Koch27Sollte bald weiter nach oben gehn

28.07.21 15:09

13215 Postings, 6707 Tage Koch27News und Traiding halt

Eloro Intersects 129.65 g Ag eq/t over 300.75m in the Mineralized Envelope of the Santa Barbara Breccia Pipe at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Source: GlobeNewswire Inc.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (?Eloro?, or the ?Company?) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 46 diamond drill holes totalling 22,398.9 metres (m) to test major target areas at Iska Iska. This press release reports drilling results from four (4) additional holes which tested the mineralized envelope of the Santa Barbara Breccia Pipe (?SBBP?) and the central-southern part of the Central Breccia Pipe (?CBP?). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. One surface drill rig is completing first pass drilling of the major Porco (South) Target. The second surface drill is currently cleaning out drill holes on the SBBP radial platform for the planned downhole induced polarization/resistivity (IP/RES) survey then will be moved to test the gap area between the Central and Porco Breccia Pipes. The third drill, an underground rig, is testing the northeast part of SBBP and its mineralized envelope. This drill will shortly be moved to a new drill bay recently completed on the west end of the Santa Barbara adit. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. Figure 2 is a more detailed geological plan map of the SBBP and northern CBP areas showing the magnetic low target to the northwest of the SBBP where drilling is planned (see press release June 7, 2021 for an overview of the magnetic results). Table 1 provides significant drilling results and Table 2 lists holes completed with assays pending as well as holes in progress in the three major target areas. Highlights are as follows:
Highlights:

Hole DHK-18, drilled due south at -10 degrees from the west drill bay in the Huayra Kasa underground workings to test the mineralized envelope of the SBBP, intersected 129.65 g Ag eq/t (18.38 g Ag/t, 2.14% Zn, 0.67%Pb, and 0.047% Sn) over 300.75m from 65.14m to 365.91m. This includes higher grade intervals of 215.54 g Ag eq/t over 72.76m, 163.35 g Ag eq/t over 31.83m and 224.48 g Ag eq/t over 19.39m. This hole intersected significant mineralization approximately 230m below the eastern part of the Santa Barbara adit from which continuous channel sampling previously reported returned 442 g Ag eq/t over 166m (see press release April 13, 2021). 82% of this 446.5m long hole contained reportable intervals;
Hole DSB-11, drilled to the southeast at -40 degrees from the SBBP radial centre to test the area approximately 300m below the Santa Barbara adit intersected 121.90 g Ag eq/t (40.27g Ag/t, 0.10 g Au/t 0.48% Pb, 0.11% Cu and 0.14% Sn) over 137.4m from 190.02m to 327.36m. This includes a higher-grade interval grading 173.53 g Ag eq/t over 80.54m. Notable intercepts lower in the hole include 76.59 Ag eq/t over 55.9m from 407.60m to 463.51m including a higher-grade section of 105.56 g Ag eq/t over 33.31m and 78.82 g Ag eq/t over 143.03m from 520.7m to 773.73m including 105.48 g Ag eq/t over 34.82m and 120.70 g Ag/t over 19.54m. Overall 61% of this 665.3m hole contains reportable intersections.
Hole DCS-01 drilled due east at -60 degrees was the first reconnaissance hole drill from the south radial platform on CBP. This hole, which was drilled to 1,007.5m, intersected 25 reportable Ag-Zn-Pb-Sn mineralized intervals ranging in size from 1.43m to 34.86m from the start of the hole to its end. Best results include 87.75 g Ag eq/t over 21.67m, 161.07 g Ag eq/t over 13.25m, 100.60 g Ag eq/t over 15.15m, 54.44 g Ag eq/t over 34.86m, 90.24 g Ag eq/t over 26.91m and 117.48 g Ag eq/t over 16.51m.
Hole DCN-03 was drilled southeast at -60 degrees from the northern radial platform of the CBP. This hole intersected nine mineralized intersections principally Sn-Ag over its 464.5m length. The best result was 48.59 g Ag eq/t (16.23 g Ag/t, 0.12% Pb and 0.064% Sn) over 15.05m.
Dr. Bill Pearson, P.Geo., Eloro?s Executive Vice President Exploration, commented: ?We are close to completing first pass drilling over three of our major target areas in the Iska Iska Caldera Complex. Following completion of the downhole IP/Res survey, we will be carrying out additional drilling in the SBBP and its surrounding envelope to define the full extent of mineralization which remains open in all directions. This drilling will also test the potential extension of the mineralized zone to the northwest as indicated by the strong magnetic low as shown in Figure 2. Hole DCS-01 intersected silver-tin polymetallic mineralization similar to what we are seeing visually in the initial drill holes on Porco. Analysis of the magnetic data suggests the potential for a centre of mineralization in the gap zone between CBP and Porco; this will be drill tested soon. The northern part of CBP is primarily an Sn target with some Ag. We will determine the follow-up drill plan there once we receive pending assays from the drill holes. Our Tupiza-based exploration team led by Dr. Osvaldo Arce, P.Geo. continues to do an excellent job keeping up with all the drilling and we thank our drill contractor Leduc Drilling for the continuing high quality drill production
-----------
Bahn fahren macht Spaß!!

26.08.21 14:01

13215 Postings, 6707 Tage Koch27News!

Eloro Resources informiert über sein Silber-/Goldprojekt La Victoria in Peru

Quelle: GlobeNewswire Inc.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FWB: P2QM) (?Eloro? oder das ?Unternehmen?) freut sich bekannt zu geben, dass im Zusammenhang mit der erforderlichen Genehmigung für die weitere Exploration bei La Victoria 82 % -  im Besitz der peruanischen Tochtergesellschaft Compañia Minera Eloro Peru SAC  (?Eloro Peru?), hat mit der Pallasca-Gemeinde in der Provinz Pallasca, Departement Ancash, Peru, eine Vereinbarung über Oberflächenrechte (die ?Vereinbarung?) abgeschlossen.  Die Vereinbarung ermöglicht die Fortsetzung der Explorationsaktivitäten, einschließlich Bohrungen, auf dem epithermalen Silberbohrziel San Markito.
Das Ziel San Markito befindet sich innerhalb der Victoria-APB-Konzession im Distrikt und der Provinz Pallasca, 430 km NNO von Lima, Peru.  Bisherige Oberflächenkartierungen und Probennahmen haben hohe Silbergehalte innerhalb einer verkieselten Brekzienstruktur in einer Höhe von 4050 m über dem Meeresspiegel bestätigt.  Signifikante Silberwerte von San Markito umfassen 994 g/t Ag mit 0,35 g/t Au in einer kontinuierlichen Diamantsägekanalprobe über 4,00 m und 390 g/t Ag mit 0,53 g/t Au über 1,53 m (siehe 14. Dezember 2016 Eloro  Pressemitteilung).  Die Untersuchungsergebnisse der induzierten Polarisation weisen auf eine steil abfallende Anomalie mit niedrigem spezifischem Widerstand und höherer Aufladbarkeit in der Tiefe hin, die räumlich mit der Oberflächenmineralisierung korreliert.  Ein 3000-m-Bohrprogramm zur Prüfung der Kontinuität der Brekzienmineralisierung entlang des Streichens und neigungsabwärts ist geplant.

Seit 2016 arbeitet Eloro Peru aktiv mit lokalen Interessenvertretern aus der Pallasca-Gemeinde und den umliegenden Weilern zusammen, um allen betroffenen Mitgliedern die notwendigen Informationen zur Verfügung zu stellen.  Am 24. Juli 2021 fand eine außerordentliche Gemeindeversammlung statt, bei der eine Mehrheit der Gemeindemitglieder für den Landnutzungsvorschlag von Eloro Peru stimmte.  Abgesehen von der Zahlung der Landpacht hat Eloro zugestimmt, der Gemeinde dabei zu helfen, staatliche Infrastrukturfonds in Anspruch zu nehmen, um die landwirtschaftlichen Praktiken der Gemeinde und den Zugang zu Wasser zu verbessern.

Nachdem die Vereinbarung abgeschlossen ist, kann Eloro Peru nun mit dem peruanischen Energie- und Bergbauministerium und der Wasserbehörde mit dem Genehmigungsverfahren für die Bohrung fortfahren.  Zu diesem Zweck wurde Geades Consulting S.A.C. beauftragt.

Der geologische Betrieb wird im September 2021 unter der Aufsicht des Chefgeologen (Peru), Marcelo Alvarez, der die Explorationsaktivitäten von Eloro Peru 2017-2018 leitete, wieder aufgenommen.  Herr Alvarez bringt 30 Jahre Explorationserfahrung in südamerikanischen epithermalen, mesothermalen und porphyrischen Lagerstättentypen mit.  Darüber hinaus verfügt er über umfassende Kenntnisse in der Modellierung und Bewertung von mineralischen Ressourcen.

Eloros Joint-Venture-Partner in La Victoria, Burgundy Diamond Mines Limited, hält einen Anteil von 18 % an Eloro Peru und kann seinen Anteil gemäß einer Optionsvereinbarung von 18 % auf 25 % erhöhen, indem er weitere 1.400.000 USD ausgibt, vorbehaltlich des Erhalts aller erforderlichen  zulassen.

Qualifizierte Person

Luc Pigeon, B.Sc., M.Sc., P. Geo., General Manager der Compañia Minera Eloro Peru S.A.C.  und eine qualifizierte Person im Zusammenhang mit National Instrument 43-101 (?NI 43-101?), hat den technischen Inhalt dieser Pressemitteilung geprüft und genehmigt
-----------
Bahn fahren macht Spaß!!

28.09.21 13:23

13215 Postings, 6707 Tage Koch27News!

Eloro Intersects 160.22g Ag eq/t (36.53 g Ag/t, 1.63%Zn, 1.20%Pb and 0.10%Sn) over 194.14 m in the Santa Barbara Breccia Pipe at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Source: GlobeNewswire Inc.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (?Eloro?, or the ?Company?) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 30,014 metres (m) in 57 drill holes including three (3) in progress to test major target areas at Iska Iska. This press release reports drilling results from two (2) additional holes which tested the Santa Barbara Breccia Pipe (?SBBP?) (Holes DHK-21 and DHK-22). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are completing drilling at SBBP in order to outline an initial National Instrument 43-101 (?NI 43-101?) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of the SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. This map depicts the recently identified robust magnetic anomaly to the northwest of the SBBP where drilling is in progress (see press release June 7, 2021, for an overview of the magnetic results). Figure 2 is a north-south section showing the major potential extension of the SBBP mineralized system. Table 1 provides significant drilling results with definitions of chemical symbols and Table 2 lists holes completed with assays pending, as well as holes in progress in the three major target areas. Highlights are as follows:
Highlights:

160.22 g Ag eq/t (36.53 g Ag/t, 1.63% Zn, 1.20% Pb and 0.10% Sn) over 194.14m from 168.85m to 362.99m in hole DHK-21, drilled from the west end of the Huayra Kasa underground workings at -70 degrees on section with discovery hole DHK-15, which intersected 129.60 g Ag eq/t over 257.5m (see press release dated January 26, 2021, and Figure 2). This intersection in Hole DHK-21 includes higher grade portions of:
250.50 g Ag eq/t (51.31 g Ag/t, 3.35% Zn, 1.78% Pb and 0.10% Sn) over 18.24m from 238.21 to 256.45m;
257.40 g Ag eq/t (75.83 g Ag/t, 2.29% Zn, 2.40% Pb and 0.12% Sn) over 16.33m from 283.57 to 299.90m; and
350.91 g Ag eq/t (112.57 g Ag/t, 1.41% Zn, 3.08% Pb and 0.33% Sn) over 30.06m from 308.90 to 338.96m.
64% of this 512.9m long hole contains reportable intersections
94.68 g Ag eq/t (3.87 g Ag/t, 0.067 g Au/t, 1.63% Zn, 0.43% Pb and 0.05% Sn) over 169.93m from 124.66m to 294.59m in hole DHK-22, drilled to the south-southwest at -60 degrees from the west end of the Huayra Kasa underground workings to test the eastern side of the SBBP. This intersection included a higher-grade zone that graded 158.64 g Ag eq/t (9.35g Ag/t, 0.016 g Au/t, 3.43% Zn, 0.71% Pb and 0.03% Sn) over 29.84m from 135.20m to 165.04m. 49% of this 600m long hole contained reportable intersections
-----------
Bahn fahren macht Spaß!!

05.10.21 13:20

13215 Postings, 6707 Tage Koch27News

Eloro Resources Makes Iska Iska Polymetallic Property Option Payment

Source: GlobeNewswire Inc.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (?Eloro?, or the ?Company?) is pleased to announce that it has advanced US$3 million as property option payments, pursuant to the Private Option Agreement (the ?Agreement?) to acquire a 99% interest in the Iska Iska silver-tin polymetallic project (?Iska Iska?) in the Potosi Department, southern Bolivia. The Agreement grants Eloro the option to acquire a 99% interest in Iska Iska for consideration consisting of 500,000 Eloro common shares, of which 250,000 have been issued, with the remaining 250,000 to be issued on or before January 6, 2022, and the payment of US$10 million, of which US$3 million has been paid to date, with the remaining US$7 million due on or before January 6, 2024.
To date, the Company has completed 31,500 metres (m) in 61 drill holes including three (3) in progress to test major target areas at Iska Iska. Currently three diamond drill rigs are active at Iska Iska, two surface rigs and one underground drill. Planned drilling for 2021 is 51,000m with the aim of outlining an initial inferred National Instrument (?NI?) 43-101 compliant mineral resource by Q1 2022. Additionally, a downhole induced polarization/resistivity (IP/Res) survey is in progress to further define drill targets and aid resource definition drilling. Preliminary metallurgical tests are also in progress. An updated NI 43-101 Technical Report is being prepared by independent consultant Micon International Ltd.

?We are extremely pleased with the progress and exploration effort at Iska Iska and are most grateful for the partnership and contributions to date by the title holder, Empresa Minera Villegas S.R.L.,? commented Thomas Larsen, CEO of Eloro. ?Due to the positive results to date from our drill campaign, initial engineering studies to establish potential economic parameters for mineral resource definition will commence shortly, with a site visit having already been completed by a top Peruvian Engineering firm. More detailed metallurgical studies are also planned
-----------
Bahn fahren macht Spaß!!

21.10.21 13:37

13215 Postings, 6707 Tage Koch27Update

Magnetisches Inversionsmodell bestätigt umfangreiches mineralisiertes System bei Iska Iska, das sich über 2,4 Kilometer Streichlänge erstreckt

Quelle: GlobeNewswire Inc.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FWB: P2QM) (?Eloro? oder das ?Unternehmen?) freut sich, ein Update zu den Explorationsaktivitäten auf seinem polymetallischen Silber-Zinn-Projekt Iska Iska in der  Potosi-Departement, Südbolivien.  Bis heute hat das Unternehmen 32.606 Meter (m) an Bohrungen in 63 Löchern abgeschlossen, darunter drei (3) im Gange, um wichtige Ziele bei Iska Iska zu testen.  Derzeit werden auf dem Grundstück drei Bohrer betrieben: zwei Übertagebohrer und ein Untertagebohrer.
Mineralressourcendefinitionsbohrungen bei Santa Barbara Breccia Pipe

Eloro setzt die Bohrungen zur Definition der Mineralressourcen im Zielgebiet Santa Barbara fort, das die Santa Barbara Breccia Pipe (?SBBP?), die umgebende mineralisierte Hülle und die potenzielle nordwestliche Erweiterung, die durch die magnetische Anomalie angezeigt wird, umfasst (Abbildung 1).  Zusätzliche Bohrungen seit der Pressemitteilung des Unternehmens vom 28. September 2021 haben das Zielgebiet für die Definition einer ersten Mineralressource gemäß National Instrument 43-101 (?NI 43-101?) auf mehr als 1.400 m entlang des Streichens mit erheblicher Mineralisierung erweitert  die in den Step-out-Löchern DSB-15 und DSB-16 durchschnitten werden, die 200 m weiter nordwestlich als die ersten Step-out-Löcher DSB-12 und DSB-13 gebohrt werden.  Diese Zielzone ist ca. 500 m breit und reicht bis in eine Tiefe von 600 m.  Weitere Auffüllbohrungen auf SW-NE-Abschnitten werden in Abständen von etwa 100 m durchgeführt.

Von der Bohrbucht am westlichen Ende des Stollens Santa Barbara wurden drei Untertagebohrlöcher gebohrt.  DSBU-01, das genau nach Osten bei -20 Grad gebohrt wurde, durchteufte umfangreiche Mineralisierungen in der mineralisierten Hülle des SBBP.  Die Bohrlöcher DSBU-02 und DSBU-03, die genau nach Westen bei -20 Grad bzw. -50 Grad gebohrt wurden, durchschnitten eine bedeutende Mineralisierung entlang des Südrands des SBBP.  Ein viertes unterirdisches Bohrloch DSBU-04 ist derzeit im Gange, das genau nach Süden bei -20 Grad gebohrt wird, um die Abdeckung der mineralisierten Hülle südlich des SBBP zu füllen.  Die Untersuchungen zu den genannten unterirdischen und übertägigen Bohrlöchern stehen noch aus.  Tabelle 1 enthält eine vollständige Auflistung der Bohrlöcher mit ausstehenden Analysen.
-----------
Bahn fahren macht Spaß!!

02.11.21 12:34

13215 Postings, 6707 Tage Koch27News

Eloro Intersects 100 Ag eq/t (including 38.71 g Ag/t, 0.88%Zn and 0.51%Pb) over 188.5 m in the Santa Barbara Breccia Pipe at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Source: GlobeNewswire Inc.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (?Eloro?, or the ?Company?) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 34,409 metres (m) in 64 drill holes including three (3) in progress to test major target areas at Iska Iska. This press release reports drilling results from one (1) additional hole which tested the Santa Barbara Breccia Pipe (?SBBP?) (Hole DHK-23) and two holes (DCN-05 and DCS-03) which tested the Central Breccia Pipe target (?CBP?). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are continuing to drill at SBBP to outline an initial National Instrument 43-101 (?NI-43-101?) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. Table 1 provides significant drilling results with definitions of chemical symbols and Table 2 lists holes completed with assays pending, as well as holes in progress in the three major target areas. Highlights are as follows:
Highlights:

Santa Barbara Breccia Pipe

100g Ag eq/t (including 38.71 g Ag/t, 0.88%Zn and 0.51%Pb) over 188.5 m from 58.67m to 247.13m in hole DHK-23, drilled from the west end of the Huayra Kasa underground workings at -70 degrees due west. This intersection includes a higher-grade portion of 154 g Ag eq/t (including 75.51 g Ag/t, 0.96% Zn, 0.65% Pb and 0.16%Cu) over 65.8m
Central Breccia Pipe

Hole DCS-03 drilled southwest at -60 degrees from the south radial platform of the CBP intersected twelve (12) separate zones of quartz-tourmaline veins in granodioritic intrusive breccia with best results of 224.92 g Ag eq/t (including 25.36 g Ag/t, 0.12 g Au/t and 0.55% Sn) over 7.42m and 113.67 g Ag eq/t (including 17.85 g Ag/t, 0.085 g Au/t, 0.21% Cu and 0.18% Sn) over 12.03m
Hole DCN-05 drilled due east at -60 degrees from the north radial platform of the CBP intersected ten (10) separate zones of quartz-tourmaline veins in granodioritic intrusive breccia with a best result of 104.72 g Ag eq/t (including 74.41 g Ag/t and 0.22% Cu) over 4.59m
Mr. Tom Larsen, CEO of Eloro, commented: ?We are now starting to see a reduction in the backlog of assay samples with two laboratories operating at near capacity. These latest drill results, especially from DHK-23, are again demonstrating the accumulating amount of potential commercial bulk tonnage material, especially within the Santa Barbara complex, a subset of the overall Iska Iska volcanic edifice.?

Dr. Bill Pearson, P.Geo., Eloro?s Executive Vice President Exploration, added: ?Mineral resource definition drilling is continuing in the Santa Barbara Target area, which is 1,400m along strike, 500m wide and extends to a depth of 600m. This target is open along strike to the northwest and southeast. Data from the downhole Induced Polarization survey is being processed and the resulting 3D inversion models should aid in refining our geological model, especially determining the likely geometry of the higher-grade zones that typically have greater sulphide content.?

Dr. Osvaldo Arce, P.Geo., General Manager of Eloro`s Bolivian subsidiary, Minera Tupiza S.R.L. (?Minera Tupiza?), said: ?As we move to the northwest in the SBBP, silver and gold values are increasing suggesting that there is a zonation at Iska Iska, from a more tin-rich polymetallic mineralization in the southeastern part of the SBBP to more of a silver-rich polymetallic mineralization in the northwestern part. In addition, significant enriched tin-silver mineralization occurs in the northern part of the CBP.?

Table 1: Significant Diamond Drilling Results, Iska Iska, as at November 2, 2021:
https://www.globenewswire.com/NewsRoom/...64d6-4e65-a54a-2c660a17b9ae

Note: True width of the mineralization is not known at the present time, but based on the current understanding of the relationship between drill orientation/inclination and the mineralization within the breccia pipes and the host rocks such as sandstones and dacites. It is estimated that true width ranges between 70% and 90% of the down hole interval length but this will be confirmed by further drilling. Percentage metal contents are shown for each element.
-----------
Bahn fahren macht Spaß!!

17.11.21 13:25

13215 Postings, 6707 Tage Koch27News !!

Channel Sampling at Porco Adit returns 103m Strike Length Grading 521 Ag eq/t (including 117 g Ag/t, 1.44 g Au/t, 0.54% Cu and 0.66%Sn) at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Source: GlobeNewswire Inc.

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (?Eloro?, or the ?Company?) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 35,738 metres (m) in 68 drill holes including three (3) in progress to test major target areas at Iska Iska. This press release reports drilling results from one (1) additional hole which tested the Porco Breccia Pipe (?PBP?) (Hole DPC-01) and new underground channel sampling from the Porco adit located approximately 200m south of the PBP. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are continuing to drill at the Santa Barbara Resource Definition Target Zone (Figure 1) to outline an initial National Instrument 43-101 (?NI-43-101?) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of Santa Barbara Breccia Pipe (?SBBP?) and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes completed, in progress and planned to complete resource definition drilling along with an updated geological interpretation. Figure 2 is a plan map of channel sampling at the Porco adit. Table 1 provides significant drilling results with definitions of chemical symbols, Table 2 details channel sample results from the Porco adit and Table 3 lists holes completed with assays pending, as well as holes in progress in the three major target areas. Highlights include:
Porco Adit

Channel sampling in the Porco adit returned 521.33 g Ag eq/t (including 117.10 g Ag/t, 1.44 g Au/t, 0.54% Cu and 0.66% Sn) over a 103m strike length with an average channel width of 1.8m as shown in Figure 2 and Table 2. Mineralization in the Porco adit is hosted in a series of veins, veinlets, stockworks and disseminations in Ordovician quartz sandstone. The veins are parallel to and crosscutting the drift. In the western part of the drift veins are primarily sulphide-bearing whereas those in the eastern half are primarily oxide. Eloro believes mineralization at the Porco adit is sourced from a large underlying porphyry system as evidenced by recently acquired magnetic susceptibility data.

Porco Breccia Pipe

Hole DCP-01 drilled due west at -65 degrees from the Porco radial platform intersected sixteen (16) separate zones of quartz-tourmaline veins in granodioritic intrusive breccia with best results of 110.30 g Ag eq/t over 3.0m, 67.08 g Ag eq/t over 6.0m including 168.25 g Ag eq/t (25.0 g Ag/t, 1.31% Zn, 0.32% Pb and 0.25% Sn) over 1.54m, 131.16 g Ag eq/t (18 g Ag/t, 0.54% Cu and 0.31% Bi) and 80.66 g Ag eq/t over 3.0m (0.23% Sn).

Figure
-----------
Bahn fahren macht Spaß!!

16.12.21 23:12

13215 Postings, 6707 Tage Koch27Sehr interessant

Seite: Zurück 1 | ... | 5 | 6 | 7 | 8 |
| 10 | 11 Weiter  
   Antwort einfügen - nach oben